Skip to main content

Aromatic Compounds

It is always refreshing to smell "aroma" of a beautiful flower or a perfume. In the early 19th century chemists came across compounds having distinctive fragrances. Then in 1825, Michael Faraday isolated a hydrocarbon compound called "benzene", with molecular formula C6H6. Such, hydrocarbon compounds having a benzene, found to have a distinctive fragrances hence, this benzene family compounds with distinctive aroma are called "Aromatic compunds".

Aromatic compounds.



In benzene(C6H6), each carbon atom uses three valence electrons to bond to one hydrogen and to two adjacent carbon atoms. Carbon actually has four valence electrons to share with any atom it is supossed to bond but here we saw in benzene, carbon atom just used three of its four valence electrons. So, the question is where this last electron got used; scientists first thought this last electron is used to form a double bond with an adjacent carbon atom. This dilemma among experts was solved by August Kekule in 1865, when he proposed that benzene structure is a flat ring in one plane with alternating single and double bonds between the six carbon atoms. 


Resonance In benzene.

Here in the figure above, as per proposed idea by August Kekule, we can see two possible structures. There are three double bonds in both the possible structures but with different locations.

Today it is well-known fact that in benzene six carbon share six valence electrons equally. But you must be thinking out of this two structures with different positions of double and single bonds which one is the Final structure of benzene. The answer to this question lies in resonance character of benzene. At any time this two structures keeps converting into one another, i.e first form to second and again, second form to first. This change is so fast that at any moment, the final structure is a hexagonal hybrid structure with ring in the centre.


Aromatic compound-benzene


Thus, all six carbon-carbon bonds in benzene are identical and equally share six valence electrons. And further, this resonance characteristic makes benzene especially stable. 


Hope you liked this article. I would love to hear from you and your each feedback would urge me to give better scientific content each time.



Comments

Popular posts from this blog

IUPAC naming of Alkenes and Alkynes.

Approximately 4 billion to 2.5 billion years ago a geological process began acting on the remains of plants and animals and as a result of such a long process occurring under layers of earth's crust, today we have fossil fuels. Coal, petroleum, natural gas, and crude oil are the fossil fuels which we use in our daily life in one or the other form and knowingly or unknowingly we have become slaves of this fossil fuels.  Organic compounds  such as alkanes , akenes, alkynes and polymers  also known as hydrocarbons, which are mainly derived from fossil fuels. This, hydrocarbons are the organic compounds majorly formed of hydrogen and carbon atoms. To know about  IUPAC nomclature of alkanes you can check out my earlier blogs. In this blog we will study alkenes and alkynes. Let's start: Alkenes and alkynes are the hydrocarbon compounds with at least one double and triple bond respectively.  Figure1.1 For example: we will see first member of alkene family, called Ethe...

How Scientists Think ?

Today, Modern science and technology has given us all the possible luxuries and amenities that previous generations could not. And it won't be an exaggeration if I told you that all this development in science and technology would not have been possible without these scientists from respective fields. Their education, working style, Intelligent quotient, and hard work has inspired every science enthusiast to become a scientist and contribute to over all wellbeing of the society. You might have read books or heard stories or seen in the movies about Einstein or Nikola Tesla and many others like how these scientists had a magical and mystical aura around them. For the first time, in my childhood, when I saw a time travel movie,I was so awstuck by the phenomenon that I could not sleep whole night. But by adulthood I got to know that time travel theory is still in its juvenile state and yet to be explored. What makes these scientists different form us and So, the question arises here, ...

IUPAC naming Of Aromatic Compounds

Definition of Aromatic Compounds: "Compounds containing benzene ring have distinctive fragrances. Hence, benzene family compounds are called Aromatic compounds . Example: Toluene, Aniline and Phenol". Figure 1.1 Long form of IUPAC: "International union of pure and applied chemistry". Aromatic compounds having benzene in their structural formula have been important in Chemistry. In the IUPAC naming of  aromatic compounds  common names of derivatives of benzene, such as Toluene, Aniline and Phenol, are used to name the whole compound. Figure  below shows the structure of Toluene, Aniline and Phenol: Let's see how these derivatives of benzene are named: No.1)   Figure 1.2 W hen benzene ring has only one substituent, there is no need of numbering. And as per IUPAC, first comes the name of substituent, followed by the common name  benzene. Example: Toluene, Aniline, and Phenol. No.2)   Figure 1.3 When benzene ring has more than one substituent, then, start ...